IMG_20210122_100640
ENGINE DISASSEMBLY

Skilled labor in engine disassembly.
• Remove engine accessories (drive belts, alternator, etc.) and label them for reassembly.
• Remove the top end components (valve covers, carburetor, intake, distributor, and valley pan).
• Disassemble the valvetrain (rocker arms, pushrods, lifters, and cylinder heads).
• Remove the camshaft (harmonic balancer, oil pan, timing cover, timing gears, and camshaft).
• Disassemble the bottom end (oil pump, oil pan baffle, connecting rods/pistons, main bearings, and crankshaft).
• Cylinder head disassembly (valves, valve springs, and valve keepers).

previous arrow
next arrow

About Us

Since founded in 1972, Poly Material Services Inc. has been trying the priority efforts to research and development, production and sales for customer satisfaction. In 2008 Poly Material Services Inc. stablished in Tecate, Mexico as Poly Material Mexico S.A de C.V. By now we have 3 plants providing products and services such as Plastic Recycling, Plastic Extrusion, Engine Recycling, Door Assembly and Washing (reusable plastic packaging).

Need more information?

ContacT US

Almacenes Nacionales No. 200, Tecate B.C.